Project Overview

Infrastructure replacement and expansion play a big role in keeping energy reliable and sustainable for communities throughout the country. From 2008 through 2012, the Centuri team was called to install and replace over 271 miles of high-density (HD) pipe in Southern Arizona for the largest natural gas distributor in the Southwest. Selected for our turnkey capabilities, the team brought expertise in project design, main pipeline replacement and installation, residential service replacement, and project coordination to the 4-year undertaking.

Key Highlights

With miles of main and service pipeline installation scheduled for completion each month, our team grew to include 18 HD replacement crews. This commitment and execution led to an additional ALDYL-A pipe replacement contract with the customer extending from 2011 through 2016 and requiring another 50 ALDYL-A replacement crews. By year-end 2016, we replaced over 500 miles of main and replacement pipe throughout Southern Arizona.

Throughout the extended project, all teams drew on their construction and coordination capabilities to refine and synchronize processes, predict and resolve potential conflicts, and successfully mobilize and execute to meet the project goals and rigorous schedule.

Explore Project Details

Project Scope of Work Included:

Construction

  • Boundary and Right-of-Way Determination
  • Topographical Surveys
  • Plan Review and Revision
  • Permitting
  • Field Survey and Staking
  • Construction Scheduling and Customer Progress Updates
  • Field Meets with City, County, and State Stakeholders
  • Open-Trench, Boring and Inserting Installation
  • Main and Service Pipeline Replacement
  • New Main and Service Pipeline Installation
  • Paving and Concrete Site Restoration
  • Pipe and Materials Inventory Management
  • Final As-Built Completion for Review and Mapping

Administration

  • Preparation of New Easement Documents
  • Conflict Identification and Resolution
  • Training and Scheduling Personnel
  • HOA Restrictions Management
  • Safety and Quality Compliance and Inspection

Challenges and Results

A full menu of design services, crew strength, tenured management, and strong customer collaboration were key to our success in delivering these substantial, long-term projects on time and within budget. As the project scope grew, we expanded design services and crew strength to fulfill the increased volume of main and service replacement and meet required deadlines.

Thanks to our real-time constructability reviews and our deep integration and trust with all the customer teams, the utility was able to realize substantial cost savings over the course of these combined 11-year projects.

Previous
Southwest Gas Gallery 1
Southwest Gas Gallery 2
Southwest Gas Gallery 3
Southwest Gas Gallery 4
Next
Previous Southwest Gas Gallery 1 Southwest Gas Gallery 2 Southwest Gas Gallery 3 Southwest Gas Gallery 4 Next
Previous 0 1 2 3 Next

Project Overview

Infrastructure replacement and expansion play a big role in keeping energy reliable and sustainable for communities throughout the country. From 2008 through 2012, the Centuri team was called to install and replace over 271 miles of high-density (HD) pipe in Southern Arizona for the largest natural gas distributor in the Southwest. Selected for our turnkey capabilities, the team brought expertise in project design, main pipeline replacement and installation, residential service replacement, and project coordination to the 4-year undertaking.

Key Highlights

With miles of main and service pipeline installation scheduled for completion each month, our team grew to include 18 HD replacement crews. This commitment and execution led to an additional ALDYL-A pipe replacement contract with the customer extending from 2011 through 2016 and requiring another 50 ALDYL-A replacement crews. By year-end 2016, we replaced over 500 miles of main and replacement pipe throughout Southern Arizona.

Throughout the extended project, all teams drew on their construction and coordination capabilities to refine and synchronize processes, predict and resolve potential conflicts, and successfully mobilize and execute to meet the project goals and rigorous schedule.

Explore Project Details

Project Scope of Work Included:

Construction

  • Boundary and Right-of-Way Determination
  • Topographical Surveys
  • Plan Review and Revision
  • Permitting
  • Field Survey and Staking
  • Construction Scheduling and Customer Progress Updates
  • Field Meets with City, County, and State Stakeholders
  • Open-Trench, Boring and Inserting Installation
  • Main and Service Pipeline Replacement
  • New Main and Service Pipeline Installation
  • Paving and Concrete Site Restoration
  • Pipe and Materials Inventory Management
  • Final As-Built Completion for Review and Mapping

Administration

  • Preparation of New Easement Documents
  • Conflict Identification and Resolution
  • Training and Scheduling Personnel
  • HOA Restrictions Management
  • Safety and Quality Compliance and Inspection

Challenges and Results

A full menu of design services, crew strength, tenured management, and strong customer collaboration were key to our success in delivering these substantial, long-term projects on time and within budget. As the project scope grew, we expanded design services and crew strength to fulfill the increased volume of main and service replacement and meet required deadlines.

Thanks to our real-time constructability reviews and our deep integration and trust with all the customer teams, the utility was able to realize substantial cost savings over the course of these combined 11-year projects.

Previous
Southwest Gas Gallery 1
Southwest Gas Gallery 2
Southwest Gas Gallery 3
Southwest Gas Gallery 4
Next
Previous Southwest Gas Gallery 1 Southwest Gas Gallery 2 Southwest Gas Gallery 3 Southwest Gas Gallery 4 Next
Previous 0 1 2 3 Next