Pediment BESS 230kV Interconnection
Located in Arizona
- Company Riggs Distler
- Capability
- Electric Infrastructure
- Completion 2025
Project Overview
In 2025, in Arizona, we completed the installation of two poles and two spans of 230kV conductor as part of the Pediment Battery Energy Storage System (BESS) 230kV Interconnection project.