Singing Grass 345kV Line
Located in Eastern Colorado
- Company Riggs Distler
- Capability
- Electric Infrastructure
- Completion 2026
Project Overview
In 2026, we are serving as a subcontractor on the Singing Grass 345kV generation tie line project in Kit Carson County, Colorado. The 603-MW wind generation facility spans approximately 57,000 acres and includes 134 wind turbines designed to deliver reliable, renewable energy to the region. Our role is central to enabling this clean energy output, constructing the critical transmission infrastructure that carries power from the Singing Grass collector substation to a major grid interconnection substation.
Project Overview
In 2026, we are serving as a subcontractor on the Singing Grass 345kV generation tie line project in Kit Carson County, Colorado. The 603-MW wind generation facility spans approximately 57,000 acres and includes 134 wind turbines designed to deliver reliable, renewable energy to the region. Our role is central to enabling this clean energy output, constructing the critical transmission infrastructure that carries power from the Singing Grass collector substation to a major grid interconnection substation.