West Caldwell BESS Project

Located in New Jersey

  • Capabilities
    • Distributed Power, Renewable & Industrial
    • Electric Infrastructure
  • Completion 2023

Project Overview

A New Jersey battery manufacturer contracted with our team for engineering, procurement, and construction of a .5 MW, 2 MWh Battery Energy Storage System (BESS). Project elements included DC batteries, containers and integral wiring, a battery management system, and other auxiliary electrical equipment for the project site in West Caldwell, New Jersey.

Key Highlights

As a turnkey construction provider and renewable technologies expert, we provided the electrical and civil construction capabilities necessary for start up and commissioning of the BESS facility.

Explore Project Details

Project Scope of Work Included:

Electrical

  • Install two (4) new (N) battery storage enclosures
  • Install new marshaling cabinet
  • Provide all new 3R outdoor electrical pull boxes
  • Install new inverter
  • Install new 75 KVA transformer
  • Install inter-connect wiring form battery storage units to marshaling cabinet
  • Provide wiring and try ins form Cab1000 inverter to existing transformer
  • Provider wiring and terminations from new inverter to existing BMS system
  • Install raceways, wiring, terminations & continuity testing
  • Provide CAT 5E ethernet connection & terminations
  • Provide fiber cable & tipping
  • Provide testing of fiber & cat 5 cable
  • Provide startup & commissioning assistance as needed at T&M
  • Provide grounding & bonding from ground grid system

Civil

  • Topsoil and Detention Basin Excavation
  • Demo Old Equipment and Place in Recycle Dumpster
  • Excavate for New Conduit Installation and Pad Extension
  • Construct Concrete Pad Extension

Challenges and Results

Our team navigated the challenges of integrating advanced battery technology, containerized systems, and auxiliary electrical infrastructure to deliver a fully functional battery energy storage system. This turnkey solution supports reliable energy storage and demonstrates our expertise in executing complex, next-generation power projects.

Previous
West Caldwell Gallery 1
West Caldwell Gallery 2
West Caldwell Gallery 3
West Caldwell Gallery 4
Next
Previous West Caldwell Gallery 1 West Caldwell Gallery 2 West Caldwell Gallery 3 West Caldwell Gallery 4 Next
Previous 0 1 2 3 Next

Project Overview

A New Jersey battery manufacturer contracted with our team for engineering, procurement, and construction of a .5 MW, 2 MWh Battery Energy Storage System (BESS). Project elements included DC batteries, containers and integral wiring, a battery management system, and other auxiliary electrical equipment for the project site in West Caldwell, New Jersey.

Key Highlights

As a turnkey construction provider and renewable technologies expert, we provided the electrical and civil construction capabilities necessary for start up and commissioning of the BESS facility.

Explore Project Details

Project Scope of Work Included:

Electrical

  • Install two (4) new (N) battery storage enclosures
  • Install new marshaling cabinet
  • Provide all new 3R outdoor electrical pull boxes
  • Install new inverter
  • Install new 75 KVA transformer
  • Install inter-connect wiring form battery storage units to marshaling cabinet
  • Provide wiring and try ins form Cab1000 inverter to existing transformer
  • Provider wiring and terminations from new inverter to existing BMS system
  • Install raceways, wiring, terminations & continuity testing
  • Provide CAT 5E ethernet connection & terminations
  • Provide fiber cable & tipping
  • Provide testing of fiber & cat 5 cable
  • Provide startup & commissioning assistance as needed at T&M
  • Provide grounding & bonding from ground grid system

Civil

  • Topsoil and Detention Basin Excavation
  • Demo Old Equipment and Place in Recycle Dumpster
  • Excavate for New Conduit Installation and Pad Extension
  • Construct Concrete Pad Extension

Challenges and Results

Our team navigated the challenges of integrating advanced battery technology, containerized systems, and auxiliary electrical infrastructure to deliver a fully functional battery energy storage system. This turnkey solution supports reliable energy storage and demonstrates our expertise in executing complex, next-generation power projects.

Previous
West Caldwell Gallery 1
West Caldwell Gallery 2
West Caldwell Gallery 3
West Caldwell Gallery 4
Next
Previous West Caldwell Gallery 1 West Caldwell Gallery 2 West Caldwell Gallery 3 West Caldwell Gallery 4 Next
Previous 0 1 2 3 Next