In August 2025, we completed the Bridge Street Bridge project in Lowell, MA, where we upgraded and relocated critical high-pressure steel gas main across an active bridge for a multinational electric and gas utility company.

Key Highlights

This job required complex bridge work, including safely supporting and securing the gas main to the existing bridge structure, precision field welding of new steel pipe, and maintaining system integrity.

Explore Project Details

Project Scope of Work Included:

  • Installation of the 6”, Coated Carbon Steel and MDPE, 60 PSIG Mains
  • Lifting of All Pipe, Supports, Fittings, Shoring, Equipment, Etc. Required For Pipe Removal & Installation
  • Operation Qualification Services Including Cutting, Welding, Testing, Lifting, Rigging, Hoisting, Flagging, Operation of Heavy Equipment, Digging, Grinding, General Mechanical Work, Sand Blasting, Mixing, Coating, Painting, Inspection, and General Labor

Challenges and Results

Much of our work was performed in challenging work zones including over a waterway and active traffic. Our team’s craftsmanship, commitment to safety, and ability to adapt to tight bridge access and complex rigging needs were key to this project’s success and ensuring system integrity.

Completing this project in 30 days demonstrates our commitment to safe, high-quality utility construction — from bridge-mounted gas mains to complex urban replacements — keeping energy infrastructure reliable for the communities we serve.

Previous
20250828 105408
Img 6879
20250827 155512 (1)
Img 20250830 085516
Next
Previous 20250828 105408 Img 6879 20250827 155512 (1) Img 20250830 085516 Next
Previous 0 1 2 3 Next

Project Overview

In August 2025, we completed the Bridge Street Bridge project in Lowell, MA, where we upgraded and relocated critical high-pressure steel gas main across an active bridge for a multinational electric and gas utility company.

Key Highlights

This job required complex bridge work, including safely supporting and securing the gas main to the existing bridge structure, precision field welding of new steel pipe, and maintaining system integrity.

Explore Project Details

Project Scope of Work Included:

  • Installation of the 6”, Coated Carbon Steel and MDPE, 60 PSIG Mains
  • Lifting of All Pipe, Supports, Fittings, Shoring, Equipment, Etc. Required For Pipe Removal & Installation
  • Operation Qualification Services Including Cutting, Welding, Testing, Lifting, Rigging, Hoisting, Flagging, Operation of Heavy Equipment, Digging, Grinding, General Mechanical Work, Sand Blasting, Mixing, Coating, Painting, Inspection, and General Labor

Challenges and Results

Much of our work was performed in challenging work zones including over a waterway and active traffic. Our team’s craftsmanship, commitment to safety, and ability to adapt to tight bridge access and complex rigging needs were key to this project’s success and ensuring system integrity.

Completing this project in 30 days demonstrates our commitment to safe, high-quality utility construction — from bridge-mounted gas mains to complex urban replacements — keeping energy infrastructure reliable for the communities we serve.