Project Overview
In 2025, at the Grove at West Street Massachusetts Bay Transportation Authority (MBTA) railroad crossing, we executed a rock Jack & Bore installation to place a new 16” steel casing beneath an active rail. The work required full excavation support with sheet piles and slide rail, protection of adjacent utilities, precise bore pit alignment, casing welding, and boring under live rail with zero tolerance for ground movement.
Project Overview
In 2025, at the Grove at West Street Massachusetts Bay Transportation Authority (MBTA) railroad crossing, we executed a rock Jack & Bore installation to place a new 16” steel casing beneath an active rail. The work required full excavation support with sheet piles and slide rail, protection of adjacent utilities, precise bore pit alignment, casing welding, and boring under live rail with zero tolerance for ground movement.